Draft
Environmental Impact Report (January 30, 2009) The Draft
EIR has identified significant environmental effects in the
following areas: surface water resources; groundwater resources;
biological resources; hazards and hazardous materials; geology,
soils, and seismicity; traffic; cultural resources; air quality;
noise; visual resources; land use; public services and utilities;
agricultural resources; and energy. The Draft EIR identifies
measures that could reduce most of these impacts to less-than-significant
levels. Some pipeline alignments proposed under the project
are near sites identified on lists compiled in accordance
with Government Code Section 65962.5 (potential hazardous
waste sites).
Notice
— DEIR Comment Deadline Extended to April 15 (PDF)
- Volume I
- Volume II
- Volume III
Alternatives to be evaluated in the CWP EIR
Regional
Water Supply Program (PDF, 8.7 MB)
Monterey Regional Water Supply Program, EIR Project Description.
Provided to the CPUC on June 4, 2008. Prepared by RMC for
California American Water, Marina Coast Water District, Monterey
County Water Resources Agency, and the Monterey Regional
Water Pollution Control Agency.
CalAm
Application (September 2004)
CalAm’s application to the CPUC to build and operate the
Coastal Water Project and recover the costs through rates,
includes the company’s environmental assessment and includes
a map of the proposed project.
Proponent’s Environmental Assessment (July 2005)
Submitted by CalAm, outlines the foreseeable environmental
impacts and helps the Commission focus its EIR efforts.
Notice
of Preparation (Sept. 29, 2006)
CPUC’s Notice of Preparation on the EIR for the CWP; inviting
resource agencies and the public to offer input on the scope
of the document, which will detail the potential marine and
terrestrialbiological, water/air quality, noise/vibration,
visual/aesthetic, land use, growth inducing and transportation/traffic
impacts of the proposed project and alternatives.
Notice of Availability (Sept.
29, 2006)
Agency
and Public Scoping Meetings Announcement (held
Oct. 24–26, 2006)
Time, place, site and other details regarding the CEQA public
meeting that allowed the public to comment on the scope of
the Environmental Impact Report.
Agency
and Public Scoping Meetings Presentation (PDF,
708KB)
Coastal Water Project
Scoping Report (December 2006)
Applicant's
Proposed Project Map (April 2007)
Alternative
Project Map (April 2007) |